This article is the continuation of previous one. PK Machinery will introduce you load testing running of scraper conveyor.
Load test running
1. Once no-load test running becomes normal , please test run with load.
2. After scraper conveyor runs with load normally, please feed the material uniformly to avoid blockage.
Load test running
1. Once no-load test running becomes normal , please test run with load.
2. After scraper conveyor runs with load normally, please feed the material uniformly to avoid blockage.
3. The casing must be fully sealed to avoid the material overflowing. A grate net must be added on the inlet to avoid massive material or hard objects enter into the scraper conveyor.
4. After material inside the scraper conveyor is discharged from the outlet completely, then stop the machine.
5. During no-load and load test running, please make a record that includes voltage, current, power and scraper chain running speed etc. and check whether they meet the requirement of design or not.
Slots - All the latest and most popular Slots at Gold Casino. 온라인카지노 온라인카지노 betway betway カジノ シークレット カジノ シークレット dafabet link dafabet link matchpoint matchpoint 온라인카지노 온라인카지노 메리트 카지노 주소 메리트 카지노 주소 메리트 카지노 쿠폰 메리트 카지노 쿠폰 188bet 188bet 301 Spades Free Online Games | Konopee - Konicasino
回复删除